PRICING
Every CT Industries project is custom-designed based on the space, risk profile, and security goals of the client. Because no two environments are the same, pricing is structured in phases, not flat packages.
Once a project moves beyond consultation and assessment, project execution is divided into three payment percentages.
PHASES
Consultation
This phase is an introductory step to determine fit, goals, and high-level needs.
Includes:
-
Private consultation (virtual or in-person)
-
Discussion of your space, concerns, and objectives
-
High-level review of risks and priorities
-
Determination of whether a full assessment is recommended
$150
Required before moving into assessment or design.
Assessment
This phase involves a deeper evaluation of your environment to inform accurate design and execution.
Includes:
-
On-site walk through
-
Evaluation of layout, access points, and infrastructure
-
Identification of physical and digital vulnerabilities
-
Preliminary scope definition and recommendations
-
Assessment summary and next-step guidance
$200 – $500+
Pricing varies by property size and complexity.
Once a project scope is finalized, project execution is billed using a milestone-based 25-25-50 structure.
PHASE 1
25% — Due at Project Scope Approval & Commitment
Collected upon approval of the final project scope to secure scheduling, allocate resources, and initiate coordination and preparation.
PHASE 2
25% — Due at Mid-Project Milestone
Collected once active execution is underway, covering ongoing work, contractor progress, integration, and project management.
PHASE 3
50% — Due Prior to Final Completion
Collected once installation and execution are substantially complete and before the final walkthrough, testing, and documentation.
This structure aligns payments with real progress while ensuring all parties are committed to the project timeline and execution.
The 25-25-50 structure applies to project execution only and does not include consultation and assessment.